Dragoon day 2 & 3 of 6

February 14th, 2009 by TheShadyRabbit

Ok day 2 went as follows, second dread is finished, hq is totaly finished, and two of the arms for the dreads are finished.

For day 3 I got a hell of a late start, so I got to the game shop at around 5:00pm Ken gave me the last of the razorbacks I needed, about 45 min later I had is assembled and based. After alot of BS’ing and procrastination I got the third razorback finished and its drying now…well minus the turret I left it at the shop..my bad. So needless to say tomorrow (day 4) will start with me painting the turret to match its brother and finishing the last two dread arms. With that done I only have the big hurdle left, the drop pods.

One of the drop pods is assembled based and modded with its magnetics, the second one is still in assembly but I have the top row of magnets in and before I go to bed Im going to put in the bottom row of magnets. As for painting them we will see how it goes tomorrow, I have a general idea of how to do it but Im not 100% on it :p Once again wish me luck, Ill post again soon, 3 days left!

Dragoons Day 1 of 6

February 12th, 2009 by TheShadyRabbit

I have about 6 days to complete my army, if I dont have all of it done by Monday I dont think I will have time to finish it in time for the tournement.  So with that on the table let me tell you where I stand.

1. Dread, hes together, painted black, and has his magnets on him
2. Dread arms, there are 4 in total, they are together and have their magnets tomorrow I will spray them down in black
3. Razorback, I wont get this untill Friday but it will only take about 3-4 hours to assemble and paint
4. 2x DropPods, this is the hardest. One of the pods is assembled, primed, and modded with magnets the other is ready to be modded and partially assembled.

If I can get this all finished I can build the display base on Monday and paint it all week off and on as long as its done by Saturday. Wish me luck I’ll update before bed tomorrow. Oh and heres a peak at the HQ

Dragoons HQ

Progress

February 10th, 2009 by TheShadyRabbit

So 2 weeks away from tourney, the 5 men of the hq squad is done, 1 droppod is ready for paint, tonight my commander will get painted. If you remember I got a dread done in about 2 hours well this morning I based the second one. So far so good.

7 min post

February 7th, 2009 by TheShadyRabbit

7 min is how long it takes to cook ramen, 4 for the water, 3 for the noodles. So things are going slow this week I school stunk on ice, the days are flying by and I can’t seem to work fast enough. So I’ve been juggling both school work and an epic level of painting. So here’s alittle check list for myself.
1. Finish news letter engine
2. Add news letter engine to portfolio
3. Add ulli documentation to portfolio
4. Code some of game (by Tuesday)
5. Finish hq and droppod by Wednesday
6. Get payment for newsletter engine
7. Try and get in touch with client

Other then that I hope tomorrow will be producive but I doubt it, I’ve got Patton Oswald tickets ^_^

Ttfn

Dragoons update

February 3rd, 2009 by TheShadyRabbit

So where are we? Three weeks till tournament that’s where. When I decided to play in the tourney with a whole new army I didn’t think about how big of an undertaking it would be. But it’s been one month and in that month I’ve completed 19 marines, 2 heavy bolter marines, 2 flame thrower marines, 3 sargents, 1 dread body (no arms but ready for magnets) 2 vindicators, and two razorbacks. The only thing needed on that lot is decals and one back banner. Really that a shitload of work.
So what’s left? 2 drop pods, 1 dread, 1 razorback, 5 marines , 1 Sargent , and the 6 man hq.
This week I plan on having the 6 man team done, and the 5 man honor guard done. The rest is on hold till after the 10th ( payday ) then it’s $100 bucks and 3 models to go.
Wish me luck.

When you die…

January 29th, 2009 by TheShadyRabbit

You pass through Atlanta airport. Haha I’m just here for a visit picking up a friend.

I aint dead!

January 26th, 2009 by TheShadyRabbit

I ain’t dead and I can proove it! I’m at phoenix games working away on the dragoons. So far I almost have one of the ten man units done! Wish me luck.

Alittle upday

January 17th, 2009 by TheShadyRabbit

So what’s been up? Well school has started and so far it looks like classes will b ok this term, portfolio prep being my only concern. I’ve been swamped with work recently trying to get a emailing app working as well as clientwork. As for the Dragoons the 20 troops are almost finished and once done that will be a big chunk of the army finished so tomorrow I’m taking the day off and going to the game shop. That’s all for now I’ll post pictures later.

Holy crap

January 14th, 2009 by TheShadyRabbit

I really wish I thought of this first

In other news the ’special topics class is a game development class run by one of the lead game designers at cartoon network. Hes a very good teacher and in just 4 hours we were building up to hit detection, his goal for the class was to build 1. Pong, 2. Centipede then 3. a platformer. We are then going to design our own game. Im looking forward to this in so many ways. I’ll keep you all updated.

Hurrah

January 13th, 2009 by TheShadyRabbit

So today has been nice I ran out and got an awesome php book at B&K, swung by pets mart and got 6 new fishies and 2 ghost shrimp, as well as a bubble disk that I’ll set up later tonight. In about an hour I have my first class of the semester, special topics, when I know more I’ll let you know. Otherwise I’ve got coffee and subway in me and I’m a happy camper! I promise I’ll post pictures of the tank soon.

« Previous Entries Next Entries »